A step-by-step plan to prepare for provisional delivery
The provisional delivery is a crucial moment: from that moment on, the possession of the house or apartment officially passes to you. Good preparation protects your rights and prevents discussions afterwards.
Below are the 10 most important steps to ensure you don't miss anything:
🔹 Step 1: Check the legal delivery date
Compare the date of the planned delivery with the agreed term in your sales agreement. Is the delivery late? Then you may be entitled to a penalty per calendar day (lateness).
💡 Tip: Prepare a registered notice of default if the term is in danger of being exceeded.
🔹 Step 2: Request all documents before delivery
Collect the following documents in good time:
design and final plans
technical data sheets and specifications
overview of additional work and approved quotations
inspection certificates (electricity, gas, ventilation, elevator, fire safety)
provisional settlement (including additional work)
draft of the delivery report
🔹 Step 3: Check whether the 3 basic conditions of the common parts are met
For apartment buildings, the following matters must be in order before delivery of a private plot:
Stairwells and circulation areas are safe (with railings)
Lift has been inspected and put into service
Fire safety system is inspected and active
❗ If not in order: refuse to deliver. You are fully within your rights.
🔹 Step 4: Bring an expert to the delivery
Get guidance from an independent expert (technical advisor or architect).
They will help you with:
detecting defects
checking finish and materials
drawing up a correct comments list
🔹 Step 5: Check whether keys will only be handed over after payment
The keys may only be handed over after all payments have been made, except for postponed works.
Make sure that:
your bank is ready for payment (via laptop or smartphone)
you can first inspect the property before you actually pay
🔹 Step 6: Make arrangements with your bank in good time
Have the remaining balance prepared so that you can transfer quickly and safely on the day itself.
Remember: if you want immediate access, you must be able to pay after signing.
🔹 Step 7: Do a quick walkthrough before payment
Before payment, please check that:
everything is present
there are postponed works
the works allow habitability
there are urgent or serious defects
Please also deduct any late fees from your payment.
🔹 Step 8: Take your time for a thorough check
Don't be rushed. There is no legal time limit for delivery.
A correct and thorough delivery often takes 2 to 4 hours, especially for larger houses or apartments.
❗ Pressure from the contractor or developer to "sign quickly" is not allowed. You have the right to proper inspection.
🔹 Step 9: Record all comments in the report
Have everything you find recorded in the provisional delivery report:
visible defects
incomplete works
postponed works
comments on additional work or deviations
agreed terms (max. 35 working days, shorter for urgent matters)
💬 Please note: “Oral promises” do not count. Only what is stated in the PV is legally enforceable.
🔹 Step 10: Request a copy of the block policy and insurance information
Check whether the block policy for the common areas is active.
Request a copy or summary, and check:
is fire safety assured?
Who is the point of contact in the event of damage before the VME is active?
Is your apartment sufficiently insured?
Ready for delivery? Then sign.
After this step-by-step plan, you are perfectly prepared. Do you have doubts, questions or need guidance?
We are at your side for a correct, transparent and legally secure delivery.